8.1   GENERAL
To supervise the contractor's project execution activities, PLN signed a contract with the Consultant associated with a local Consultant to obtain services, which includes the construction supervision service.
8.2   SITE INSTRUCTION
The consultant shall actively assist PLN with construction supervision activities including but not limited to :
(a)     Review and comment on the contractor's execution of site works.
(b)    Review, comment on and monitor the contractor's project construction schedule.
(c)        Assist in inputting and updating PLN's Artemis construction schedule.
(d)        Review and comment on contractor's activity progress report (weekly, monthly and quarterly progress report).
(e)        Review and comment on contractor's construction quality assurance program, practices, test and results for any equipment and system specified in the contract.

(f)         Review and comment on contractor's construction practices to minimize deleterious effects on environment and ecology, with due consideration given noise level and safety.
8.3   INSPECTION OF WORK
The inspection of work should be conducted by joint PLN Site Project/Consultant's Supervision and other relevant discipline engineer in order to obtain factual data which is necessary for supporting relevant data in acceptance and certification of the complete work of system or subsystem of the project.
8.4   CONSTRUCTION SURVEILLANCE
The project construction work performance of the contractor will be continuously and closely monitored by joint PLN Site Project/ Consultant's Supervision according to the specification codes (including the safety code and environmental maintenance), standards and contract.
8.5   DOCUMENTATION
In order to establish a degree of control and formality in dealing with Construction related activities the following documentation procedures have been provided:
a)    Inspection Application and Inspection Report.
b)    Construction Defect Reports.
Samples of Report, Notes of Guidance on use, document flow charts and Registers are contained in Appendix 8.1
c)    Site Change Requests.
d)    Site Instruction.
This Instruction is intended for limited use when other routine forms of Contractor instruction have met with negative response and a direct, written instruction is necessary: It carries no financial commitment but never the less is an authoritative document and must be used judiciously.
Samples of the Site Instruction together with a document flow chart and Register is contained in Appendix 8.3.
8.6   PROGRESS MONITORING
(a)       Review and comment on contractor's progress reports (weekly, monthly and quarterly).
(b)      Review and update the contractor's schedule.
8.7  PHOTOGRAPHS
Photograph will be taken to provide a clear picture of the construction progress for individual equipment, subsystem and system.

9.    TESTING AND COMMISSIONING
9.1    GENERAL
The Consultant, with the active involvement of local Consultant's staff shall advise and assist PLN on all aspects of Commissioning supervision within the PLN scope of responsibility.
9.2    SCOPE
Such advice and assistance described in the forgoing shall include, but not be limited to :
a)      Formulation of joint Commissioning strategy, policy and documentation systems between PLN and the Contractor.
b)         Review of "Start-up, Turnover" Packages as supplied by the Contractor.
c)      Review of Commissioning and Test Procedures as supplied by the Contractor
d)         Review Test results and report upon them as shall from time to time be required.
e)      The Consultant shall attend upon such tests, demonstrations and inspections as are from time to time deemed appropriate, for the purpose of assisting PLN in the adjudication of results.
Examination of Steam Blow target plates, oil or water flush samples and internal condition of plant items after cleaning activities, are examples of such adjudication requirements.
9.3   DOCUMENTATION
In order to establish a degree of control and formality in dealing with Construction, Commissioning and Warranty related activities, the following documentation procedures have been provided:
a)   Commissioning Document Review.
In order to formally pass PLN comments on to the Contractor and identify an Approval Status on both Start-up Turnover Packages and Commissioning and Test Procedures, a common document review form lias been devised in conjunction with PLN.
Samples of Commissioning Document Review forms and the two customized associated Transmittal Documents are contained in Appendix MKI1 9.1.
Also in Appendix 9.1 are samples of Registers of:
                                 i)       Inspection and Test Records
                                ii)       Commissioning Documentation and Progress (Packages)
                               iii)       Commissioning Procedures Progress

b)   Construction Completion Certificates.
A system has been developed along with the Contractor for a formal transition from Construction to Commissioning. The associated forms are the Construction Completion Certificate and the Remarks Sheet.
Both forms are generated by the Contractor.
The Construction Completion Certificate serves two purposes.
                                 i)       To request a Final Inspection, termed a "Walk down".
                                ii)       To request and approve Energisation when Construction is satisfactorily completed.
The remarks Sheet is for noting outstanding defects at the time of final Walk down and placing them into two categories.
                                 i)       'A' defects, which must be resolved before energisation.
                                ii)        'B' defects, which must be resolved before TOC.
Samples of these two forms are contained in Appendix 9.2.
c)        Inspection/Test Application and Inspection/Test Report.
d)        Construction Defect Reports.
e)        Warranty Defect reports.
Samples of Report, notes of guidance on use, document flow charts and Registers are contained in Appendix 8.1.
f)         Site Change Requests.
These are expected to come into greater use during Commissioning.
g)        Site Instruction.
This Instruction is intended for limited use only when other routine forms of Contractor instruction have met with negative response and a direct, written instruction is necessary. It carries no financial commitment but nevertheless is an authoritative document and must be used judiciously.
Samples of the Site Instruction together with a document flow chart and Register is contained Appendix 8.2.

10        SAFETY, SECURITY AND HEALTH MANAGEMENT PLAN
10.1      HEALTH AND SAFETY MANAGEMENT PLAN
10.1.1     INTRODUCTION
This plan outlines the steps and measures to be taken by Contractor and all element so that all construction activities required for the construction and completion of the PLTU Kendari Unit 3 are carried out in a safe and hygienic manner consistent with proven good practice, and comply with all safety, security and health statues, laws, regulations, codes of practice and other things relevant to health and safety that may from time to time apply to the works.
10.1.2     PROJECT DESCRIPTION
This project is a turnkey work which comprises the engineering design, procurement, manufacturers, construction & erection of the coal fired steam power plant.
10.1.3     HEALTH AND SAFETY POLICY
A policy statement confirming the Consultant to promote and maintain high standard of health and safety at the work place at all time is attached as in Appendix 10.1


10.1.4     STATUTORY AND CONTRACTUAL OBLIGATIONS
All statutory legislation that are in force during the period of contract will be complied with, including:
-       Relevant Indonesian Laws and Regulations
-       Environmental Protection (ISO14000 Standard)
-       The Contract signed with the Owner
-       Relevant Regulations of Consultant
10.1.5     SAFETY, SECURITY AND HEALTH ORGANIZATION STRUCTURE
The Safety Security Health Committee is depicted in Appendix 10.2
This committee is headed by the Project Manager and assisted by the Environmental Engineer as Safety Security Health Officer (SSH Officer). The organization consists of members representing management, staff and workers.
10.1.6     ROLES AND RESPONSIBILITIES
a)    Safety Security Health Committee
     Keep under review the measures taken to ensure the safety, security and health of persons at the place of works.
     Advise Management on matters regarding safety, security and health
     Assist Management in solving health and safety problems.
     Act as a mean of communication in the organization in matters pertaining to safety, security and health.
b)      Project Manager (PM)
     Develop, implement and maintain an effective safety, security and health plan at site.
     Ensure that all personnel receive appropriate safety training.
     Ensure that all operation planning includes safety and security.
     Ensure compliance with applicable regulations.
     Ensure regular safety inspections and meetings are being held.
c)     Environmental Engineer / Safety Security Health Officer (SSH Officer)
     Advise and coordinate all matters pertaining to safety, security and health.
     Ensure compliance with applicable regulations.
     Performing the duties of the secretary to the Safety Security Health Committee.
     Investigate and report on accidents and non-conformance.
     Collect, update and maintain proper records on health and safety, security incidences.
d)    Safety Security Health Committee Members (SSH Members)
     Appointed from key members of Project Management
     Advise and coordinate all matters pertaining to safety, security and Health
     Assistant SSH Officer to execute and ensure compliance
     Lead respective departments to execute the decision
e)     Local Affair Office
     Advise and coordinate all matters pertaining to safety, security, health and other affairs in connection with local community and public relation
     Handle and address events in connection with local community and public relation
     Engineer and SSH Officer or on their behalf to address above matters if necessary.
f)     Departments,   Supervisory Team and Contractors   and their Engineers
     Ensure that the work place and system of work are being maintained in a safe condition and does not cause health hazard.
     Assess hazard potential for all activities under their control, recording the results of assessment accurately and systematically and devising appropriate preventive and precautionary measures accordingly.
     Caution and advise the workers of potential hazards which are outside their jurisdiction and control.
     Implement and fulfill assignments / duties in connection with safety, security and health, as delegated by the Project Manager from time to time.
g)     All Personnel
     Take reasonable care for the safety, security and health of themselves and others who may be affected by their actions or negligence in one-way or other.
     Cooperate with their Owner to enable him / her to comply with the relevant legal / statutory / legislative requirements in respect of safety, security and health.
     Refrain from intentionally or recklessly, interfering with or misusing anything specifically provided to ensure safety, security and health, at the work place.
     Wear and use suitable Personal Protective Equipment (PPE), such as safety devices, shoes, helmet and clothing.
     Familiarize with the relevant requirements as stipulated in the Project Safety, security and health Plan.
     Report any accident and damage to property and equipment to the immediate supervisor as soon as possible, irrespective of whether or not there is any person injured.
     Offer suggestion to the immediate supervisor and/or SSH Officer on how standard of safety, security and health at the work place can be improved and/or rectified as the case may be.
10.1.7     HEALTH AND SAFETY RULES AND PROCEDURES
The basic Health and Safety Rules and Procedures of Consultant as contained in Appendix 10.3. Are to be closely observed and adhered to by all personnel at the site.
10.1.8     TRAINING PROGRAMMER
a)     Indoctrination of Employees
Before any new employees are sent out to work, they shall attend an indoctrination briefing by the Safety, Security and Health Officer (SSH Officer). The briefing will include:
      Company Health and Safety Policy
      General instruction on the work site and the work to be performed
      General safety rules and procedures for the work site
      The proper use of protective equipment
b)     Other Training Courses and Facilities
Other training courses and facilities will be conducted either on-the-job or off-the-job as required. This will include instruction in the proper methods of performing the work and how to recognize hazard and prevent them especially for new equipments and new method of construction.
10.1.9     HEALTH AND SAFETY MEETING
The Safety Security Health Committee Meeting shall be held at least once a month and shall cover the subjects/issues as shown below:
Matters To Be Discussed At Site Safety.security and health Meeting
1.0    Accident Reports
-  Occurrence since last meeting
-  Causes Corrective
-  Action/Recommendations
2.0    Accident Prevention
-  Personal Protective Equipment
-  Safety Signs
-  Housekeeping
-  Training / Tool Box Talks / Literature
3.0   First Aid
-  Review facilities and training of personnel
4.0   Fire Prevention/Flood
-  To make clear the escape route
-  To confirm the fire extinguishers are in place
5.0   Next month's activities
-  Review safety requirements
6.0   Any other matters
-  Include the reports / factual information provided by Occupational Safety, security and health officers or by other government agencies on matters pertaining to safety, security and health at place of work
10.1.10       IN-HOUSE INSPECTION/AUDITING
a)         Site Inspection
Everyday supervisors/engineers of Project Management shall conduct a safety only inspection of their work areas to identify and rectify any possible hazard. Any unsafe conditions observed should be documented on the form along with corrective measures taken to rectify the situation.
Completed inspection forms shall be submitted to the SSH Officer.
b)         Internal Safety Audit
The SSH Officer and Project Manager will conduct safety Audits at least once every three months. Audits will include identification of unsafe features and breakdowns in procedures and policies. During Safety Audits, the SSH Officer and Project Manager will:
·           Tour the entire job site and note any observed unsafe practices on the Work Site Safety Inspection Form along with the corrective measures enforce.
·           Review Work Site Safety Inspection Forms submitted by Project Engineers/Supervisors and verified that all noted unsafe practices have been rectified.
·           Review minutes of SSH Committee Meeting and ensure that all relevant concerns have been addressed.
Results of the Safety Audits shall be reported and discussed in the next SSH Committee Meeting every week.
10.1.11    ACCIDENT INVESTIGATION/REPORTING PROCEDURES
All accident, "near-misses" incidents and hazard should be reported to the SSH Officer within 24 hours by the site supervisor with the Accident. Accident Report Form shows in Appendix 10.4.
All accident scenes shall be left undisturbed (if it is safe to do so) until full investigation is conducted and the SSH Officer authorizes clearance.
On receiving the accident report the SSH Officer shall immediately carry out an investigation through observation, analysis and evaluation of all factual evidences and record all information using the standard Accident Investigation Report Sheet.
The SSH Officer shall ensure that the relevant statutory authorities are notified where applicable.
10.1.12    EMERGENCY RESPONSE PLAN (ERP)
Hereunder are some main points to be emphasized when an Emergency Response Plan is prepared for general purposes:
(1)        Make a commitment to devote the necessary  resources  to  conduct  proper Emergency Preparedness.
(2)     Incorporate other emergencies with a dam break. Inclusive of examples; hazardous materials response, bomb threats and mass casualty incidents.
(3)     Establish a First Emergency Response Team lead by SSH Officer, with members to be voluntary and drawn from among the Project's construction personnel.
(4)     Emergency Preparedness to include an education and training program for all employees not directly involved in Emergency Preparedness as a member of the organization.
(5)     Invite local community emergency services to participate in training activities with project personnel.
(6)     Ensure the people assigned the responsibility for public and media relations are trained and skilled in this function.
(7)     Ensure that ERP training is ongoing. The skills cannot be taught just once. They must be reinforced and updated on a continual basis.
(8)     Conduct a technical survey of communication needs for the Project. Have this done by a competent trained professional to identify the best type of radio and telephone communications technology for this project in this location.
a)    DISPLAY OF INFORMATION
The SSH Officer shall prepare and exhibit conspicuously notices containing the following important information:
-     Important telephone numbers, e.g. fire station, police station, hospital, VIP and names of responsible persons to be contacted.
-     Location of the nearest hospital and fastest route to be taken.
-     Route of emergency evacuation and escape.
-     Location of safe place to assemble during emergency.
-     Location of first aid box facilities and nursing room.
-     Location of vehicle for emergency transportation of injured persons to the nearest hospital.
-     Names and telephone numbers of site fire fighting team and list of available facilities and their locations.
-     Names and telephone numbers of site rescue team/ERP team.
This important information shall be made known to alt workers during the SSH Committee Meeting and other occasion and shall be displayed at prominent places.
b)    EMERGENCY PROCEDURES
i)   ACCIDENTS
The first priority in the case of any accident is to obtain proper medical assistance for the victim.
The following steps should be followed in the event of an accident, generally in the order they are listed: -
-     Upon discovering an accident, call to attract the attention of others nearby for assistance.
-     Assess the hazards at the scene and make the area safe for yourself, the victim and others. Typical hazards to be aware of are: live electrical lines, moving equipment or machinery, traffic, hazardous chemicals, fires and collapsing structures. Move the victim only if he is in immediate danger.
-     Send someone to call for emergency help. Locate the nearest First Aid officer or any personnel trained in First Aid. If no qualified personnel are available, locate the nearest radio and call the office.
-     Protect and shelter the victim until medical help arrives.
ii) FIRE
A means of warning of fire will be established at the start of the contract Fire Marshall/safety staff will be appointed at each work site to assist the SSH Officer in case of fire.
The following emergency procedures are to be followed: -
-     Raise the alarm; Shout "Fire, Fire!"
-     Inform the Fire Marshall who will call or nominate someone to call the Fire Brigade.
-     On hearing the Fire Alarm:
-     All personnel will leave the work site and report to the assembly area.
-     Report to the Fire Marshall.
-     Do not stop to collect personal belongings.
-     If possible turn off electrical equipment and shut cylinder valves.
-     In the event of a minor fire, use the fire extinguishers. Do not put yourself at risk.
-     Obey instructions from the fire marshal /fire fighter
-     Do not re-enter the building until told it is safe to do so.
-     Move any casualty to safety away from fire, smoke or falling debris.
iii) FLOOD
The following emergency procedures are to be followed if flood/tsunami happens:
-     Raise the alarm; Shout "Flood!!!"
-     Inform the SSH Officer/staff who will call local flood/tsunami observation agency
-     On hearing the Siren/alarm/radio/loudspeaker
-     All personnel will leave the work site and run to the designated assembly area/ place which is at high level/elevation
-     Report to the supervisors
-     Do not stop to collect personal belongings
-     Keep off the unsecured structure and look for secured structure
-     If possible turn off electrical equipment and shut cylinder valves
-     Obey instructions from the SSH Officer
-     Do not re-enter the building until told it is safe to do so.
c)   EMERGENCY CALL OUT
Please refer to the table for the relevant personnel to be contacted during an Emergency Call Out.
No
Name
Position
Phone No.
Role
1.
TB
Project Manager

Commander
2.
TB


Asst. to Commander
3.
TB


On duty Controller
4.
TB


Chief Coordinator
5.
TB


Coordinator
10.1.13    PEST CONTROL PROGRAMMER
Proper housekeeping such as maintenance of sanitary, drainage, waste/garbage, workers' living quarters, canteen, site recreational areas, workshops and other working areas will be carried out daily.
Regular fogging and larviciding will be carried out to prevent breeding of mosquito.
Continuous health education to workers will be done during routine meeting.   .
10.1.14    ACCIDENT ANALYSIS
All near-miss incidents and accidents shall be reported and recorded by the Project Manager. Man-hours lost time accidents shall be maintained for statistical purposes.
10.1.14    ACCIDENT ANALYSIS
All near-miss incidents and accidents shall be reported and recorded by the Project Manager. Man-hours lost time accidents shall be maintained for statistical purposes.
10.2      SECURITY PLAN
10.2.1     SECURITY POLICY
It is the policy of Consultant and its Project Management Team to be fully committed in ensuring that proper security within the project site is maintained at all times throughout the period of the contract.
10.2.2     ORGANIZATION STRUCTURE
The organizational structure share one organization with Safety Security Health Committee
10.2.3     ROLES AND RESPONSIBILITIES
a)     Project Manager
      Develop, implement and maintain an effective Security Plan at site.
      Ensure compliance with applicable regulations.
      Ensure regular meetings are being held to discuss and resolve security issues.
b)    SSH Officer
        Assist the Project Manager in developing, implementing and maintaining of an effective Security Plan at site.
      Advise and coordinate all matters pertaining to security at site.
      Investigate and report on incidences on security.
      Collect, update and maintain proper records on security issues.
c)    Security Personal
      Assist the SSH  Officer on the day-to-day  running of the Security Management.
10.2.4     SECURITY MANAGEMENT PROCEDURES
The Owner's site security requirement will be closely followed and adhered to throughout the contract period.
a)    Main Entrance and Exit
The main entrance and exit to the project site shall be sited at the end of the existing bituminous access road to the site.
b)    Guard House or Post
Guard Houses or Posts will be built at the main entrance to the site and at the entrance to all site facilities such as site offices, camps or residential quarters.
c)    Security Guards-Patrol and Static
24-hour static security guards will be stationed at all guardhouses and patrol security guards will carry out patrol surveillance of the compound within the security areas at regular interval.
d)    Security Equipments
The following basic security equipments will be provide at the site:
      notebooks
      communications equipment
      whistles
      batons
      torch lights
      uniforms( safety boots and hat)
      safety vest/raincoat
      fire weapons(where necessary)
      barriers
      safety cones and safety tapes
      blinkers
      flashing batons
      first aid kid
      appropriate signage
      moveable gates
e)    Communications
An efficient trunk radio communication system will be installed at the site with sufficient numbers of base sets and mobile/handsets allowing instant contact among the Project Manager, SSH officers and all security guards on duty.
f)     Security Work Pass/Vehicles Permit
The Owner will provide site perimeter security, and Consultant recommend all personnel to apply for and carry site identity cards and vehicle permits within the project site. Consultant will give full co-operation to the Owner's security representative on this arrangement and the SSH Officer is designated for this purpose.
g)    Visitors
All visitors entering the site are required to apply for and carry site visitor identity cards at the main entrance.
h)    Delivery Vehicle
All delivery vehicles carrying goods into or out of the site will be subjected to security check at the main entrance.
i)     Signage
Proper security signage will be erected at all the entrances and control posts.
10.2.5     Emergency Response Plan
In case of emergency, such as illegal intrusion the security guard on duty should immediately contact through trunk radio the SSH Officer who shall immediately sent more security staffs to the site to assist and reinforce. If the situation is serious the police and local community should be informed immediately.

11.0      ENVIRONMENTAL MANAGEMENT PLAN
11.1      INTRODUCTION
This plan outlines the steps and measures to be taken by Contractor so that all construction activities required for the construction and completion of the PLTU Kendari Unit 3 are carried out in a safe and hygienic manner consistent with proven good practice, and comply with all safety, security and health statues, laws, regulations, codes of practice and other things relevant to health and safety that may from time to time apply to the works.
11.2      STATUTORY AND CONTRACTUAL OBLIGATIONS
All statutory legislation that are in force during the period of contract will be complied with, including:
-     Relevant Indonesian Laws and Regulations
-     Environmental Protection (ISO14000 Standard)
-     The Contract signed with the Owner
-     Relevant Regulations of Contractor
11.3      ROLES AND RESPONSIBILITIES
a)     Project Manager
·       Develop,    implement    and    maintain    an    effective    Environmental Management Plan at site.
·       Ensure compliance with applicable regulations.
·       Ensure regular meetings are being held  to  discuss  and   resolve environmental issues.
b)    Environment Team
To conduct regular self audit on the Environmental Management at site including environmental monitoring for air, noise and water as well as all necessary laboratory analysis throughout the duration of the construction period.
c)     Environment Officer
·       Assist the Project Manager in developing, implementing and maintaining of an effective Environmental Plan at site.
·       Advise    and    coordinate    all    matters    pertaining    to    environmental management
·       Performing the duties of the Secretary to the Environmental Management Team.
·       Investigate and report on incidences and non-conformance.
·       Collect, update and maintain proper records on environmental issues.
d)    Environment staff
Assist the Environmental Engineer/SHE Officer on the day-to-day running of the Environmental Management.
11.4      ENVIRONMENTAL MONITORING AND AUDIT
The consultant construction site shall actively assist PT. PLN (Persero) Pembangkitan Sulmapa to monitor construction of the power plant to compy with the standard and environment, review, evaluate and assist the contractor in controlling environment pollution and ecology and work safety control.
11.4.1     Water Quality
Monthly monitoring of water quality will be conducted. Water samples in water courses downstream from point of discharge of all silt trap ponds, site office and accommodation premises will be collected for testing.
The standards quality for living water and waste water shall refer to the Decree of Minister of Environment No.51/1995:
a)    Water Quality Discharge Requirements refer to the Contract Document
11.4.2     Air Quality
Air quality monitoring will be undertaken once in three months. The air monitoring locations will be sited within the project site as well as at the settlements/residential areas within 1 km of the project site boundary.
The standards quality for ambient air shall refer to the Government Decree no 41, May 26, 1999 concerning the National Ambient Level Standard of Air Pollutant.
The Parameters to be monitored during the air monitoring program refer to the the Contract Document
11.4.3     Noise Levels
Noise level monitoring will be conducted at the residential areas adjacent the boundary of the project site, the workers and staffs camp.
The codes and standards for noises are as the following:
·           PLN's Standards (SPLN 46-1: 1981 and SPLN 46-2:1981)
·           US Department of Labor, Occupational Safety security and health Act 1970
·           ANSI SI-13-1971 and appropriate standards approved by the Owner.
Parameters to be monitored are:
Parameters
Required Limit in Contract Document
Noise Level (outside boundary) :

  • during daytime(6am-10pm)
  • during nighttime(10pm-6am)


Detailed requirement for the noise Contract of Contractor

Popular posts from this blog

Anggapan Al-Quran Sebagai Karangan Nabi Muhammad SAW

Ekstrimisme (Yang Dikutuk) Kita sekarang akan mengizinkan Roh Kebenaran untuk menempatkan Hantu dari orang Yahudi dan ekstrimis Kristen, dan membuat catatan tegas sehubungan dengan perbedaan mereka tentang Mesias. Orang-orang Yahudi berkata bahwa Yesus adalah anak tidak sah dari Maryam karena ia tidak dapat menunjukkan seorang ayah. Orang-orang Kristen dengan alasan yang sama membuatnya menjadi Tuhan dan anak keturunan Tuhan. Hanya cukup satu ayat saja untuk menolak kebohongan ini:  "Wahai Ahli kitab, janganlah kamu melampaui batas dalam agamamu, dan janganlah kamu mengatakan terhadap Allah kecuali yang benar. Sesungguhnya Al-Masih, 'Isa putra Maryam itu, adalah utusan Allah dan (yang diciptakan dengan) kalimat-Nya yang disampaikan-Nya kepada Maryam, dan (dengan tiupan) roh dari-Nya. Maka berimanlah kamu kepada Allah dan rasul rasul-Nya dan janganlah kamu mengatakan, '(Tuhan itu) tiga ; berhentilah (dari ucapan itu). (Itu) Lebih baik bagimu. Sesungguhnya Allah Tuhan...

PUMPS IS A MACHINE

INTRODUCTION A pump is a machine that imparts energy into a liquid to lift the liquid to a higher level, to transport the liquid from one place to another, to pressurize the liquid for some useful purpose, or to circulate the liquid in a piping system by overcoming the frictional resistance of the piping system. The pump is one of the oldest machines invented by man. The earliest pumps devised for raising water, such as the Persian and Roman waterwheels and the more advanced Archimedes screw, were invented to raise water from the hold of a ship. Since that time, many variations and applications of pumps have been developed, which in most cases can be classified into two basic methods used to impart energy to a liquid: volumetric or positive displacement, and addition of kinetic energy.

Belajar Dan Memahami Makna Wajah

Menarik sekali jikalau kita terus menerus belajar tentang fenomena apapun yang terjadi dalam hiruk-pikuk kehidupan ini. Tidak ada salahnya kalau kita buat semacam target. Misalnya : hari ini kita belajar tentang wajah. Wajah? Ya, wajah. Karena masalah wajah bukan hanya masalah bentuknya, tapi yang utama adalah pancaran yang tersemburat dari si pemilik wajah tersebut. Ketika pagi menyingsing, misalnya, tekadkan dalam diri : "Saya ingin tahu wajah yang paling menenteramkan hati itu seperti apa? Wajah yang paling menggelisahkan itu seperti bagaimana?" karena pastilah hari ini kita akan banyak bertemu dengan wajah orang per orang. Ya, karena setiap orang pastilah punya wajah. Wajah irtri, suami, anak, tetangga, teman sekantor, orang di perjalanan, dan lain sebagainya. Nah, ketika kita berjumpa dengan siapapun hari ini, marilah kita belajar ilmu tentang wajah. Subhanallaah, pastilah kita akan bertemu dengan beraneka macam bentuk wajah. Dan, tiap wajah ternyata dampaknya...